Do I Need OSD for a Duplex in Parramatta?

Publish Date

23 November 2026

Cross-section of a duplex on a rear-falling lot draining its underground OSD tank through an easement to a Council pipe

Hussein Naji BE(Hons) MIEAust CPEng NPER – Director, Horizon Engineers

The short answer

Yes. City of Parramatta’s Development Engineering Design Guidelines list dual occupancies and duplexes as development that needs on-site detention (Section 2, clause 1.1(c)). The 150 m² minor-works exclusion does not apply to dual occupancies (clause 1.2(e)). So the real questions are how big the tank is, where it goes, and how it legally discharges. Those are what hold up approvals.

What OSD actually is

OSD is a tank or storage area that holds stormwater during heavy rain and releases it slowly through a restricted outlet, called an orifice. The aim is to keep the peak flow leaving your site at or below what left it before development. A duplex replaces lawn with roof and driveway, so without OSD it sends much more water downstream, much faster.

OSD isn’t the same as a rainwater tank. A BASIX rainwater tank is there for reuse. An OSD tank has to be empty and ready for the next storm. Some designs combine the two, but Council will check that the detention volume sits separately from the reuse volume.

What triggers OSD in Parramatta

Parramatta LEP 2023 clause 6.5 (Stormwater management) is the head of power. The detailed rules sit in Council’s Development Engineering Design Guidelines, which set the sizing method by the former council area your lot falls in:

  • Former Parramatta City area: design to the UPRCT OSD Handbook, 3rd or 4th edition (clause 2.0). The area is split into 10 catchments, each with its own storage and discharge figures. For example, Toongabbie Creek under the 3rd edition is 470 m³/ha storage and 80 L/s/ha permissible site discharge.
  • Former Hills Shire and Holroyd areas: 470 m³/ha and 80 L/s/ha under the 3rd edition.
  • Former Hornsby area: post-development 20-year ARI flow must not exceed pre-development 5-year ARI flow.
  • Former Auburn area: zone-based figures, with no OSD in Zones 6 and 8.
  • Rainwater tanks: only the dedicated airspace can partly offset OSD volume, and only under the 4th edition.

For residential development, OSD must be an underground tank, not an above-ground basin (clauses 3.1(a) and 3.1.2(a)). Council generally wants 1200 mm minimum internal depth, with 900 mm considered on tight sites, and 900 × 900 mm access grates. Habitable floors need 200 mm freeboard above the OSD top water level, and garages 100 mm.

The easement problem

This is where most duplex projects come unstuck. All development must drain by gravity (Section 1, clause 3.0). Up to 30 L/s can go to the kerb. Above that, you connect to Council’s pipe network, generally within 15 m. If the site falls away from the street, or is flat, the rules tighten:

  1. You need an easement over the downstream property to a legal point of discharge (clauses 4.0 and 4.1).
  2. Filling the site, extending Council’s drainage more than 15 m, or pumping are not permitted as workarounds. Pump-out is only for basements and driveways, and can never drain an OSD tank (clause 3.6). Charged lines are for single dwellings only (clause 3.4).
  3. The neighbour’s written consent must be in hand before you lodge the DA (clause 4.2). Full operational consent waits until the easement is registered with NSW Land Registry Services.
  4. Council warns a dual occupancy may not be possible at all if no easement can be obtained, and asks for a pre-lodgement meeting on flat or low-level sites (clause 4.3).

On a site that falls away from the street, the OSD tank must drain by gravity through a registered easement over the downstream lot.

We recently handled a Parramatta Council request for information on a duplex where the dispute came down to exactly this: OSD location versus easement. The lesson is to sort out the discharge route before you lodge, not after Council asks.

Common mistakes we see

  • Sizing OSD with the wrong catchment or handbook edition.
  • Counting the whole rainwater tank as detention, when only the dedicated airspace counts, and only under the 4th edition.
  • Proposing a pump-out for the OSD, which Council won’t accept.
  • Lodging a rear-falling duplex without the downstream owner’s consent to an easement.
  • Leaving out the overflow path, or sending overflow into a neighbour’s yard without an easement (clause 3.1(j)).
  • Forgetting the restriction and positive covenant on title, which must be registered before the occupation certificate (clause 3.7).
  • Engaging the stormwater engineer after the architectural plans are locked in.

What to do before you lodge

  1. Get a survey with levels that reach the downstream boundary.
  2. Check which catchment controls apply to your lot.
  3. Confirm the legal point of discharge.
  4. Bring in a stormwater engineer at concept stage, while the layout can still change.

Bottom line

For a Parramatta duplex, plan on OSD from day one. The tank is rarely what holds up approval. The discharge route is. Get that settled early and the rest of the approval goes far more smoothly.

Horizon Engineers designs stormwater and OSD systems for residential and commercial developments across Sydney. If your duplex has a tricky fall or an easement question, get in touch or see our stormwater design services.

Frequently asked questions

Does a duplex in Parramatta need OSD?

Yes. Council’s Development Engineering Design Guidelines list dual occupancies and duplexes as development that needs on-site detention.

Can I use a pump to drain my OSD tank?

No. Council does not accept pump-out systems for OSD. Pumps are only allowed for basements and driveways.

What if my block slopes away from the street?

You’ll need a drainage easement over the downstream property, with the owner’s written consent before you lodge the DA.

Does my rainwater tank count as OSD?

Only its dedicated airspace can partly offset the OSD volume, and only under the UPRCT Handbook 4th edition.


Disclaimer: This article is general in nature and based on City of Parramatta’s Development Engineering Design Guidelines. It is not advice for any particular site. Get site-specific engineering advice before relying on it.